Salute to Our Colleague Who Stuck by Their Posts During the Holiday Season Upholding High Standards for Safe Production and Construction

Author:Ubridge New MaterialRelease Time:2025.05.01

During Labor Day, when most people were immersed in the joyful atmosphere of the holiday, the two production bases of Ubridge New Material and the construction site of the South China Titanium Valley Project were in full flow. The teams of the production bases and the project construction were on duty, with staff sticking to their post and responsibility to maintain a full load operation of production and the construction progress of the new project.

At 9:00 a.m., Chairman Mr. Li Lvhua and Vice President Mr. Li Yuxuan arrived at the construction site of the South China Titanium Valley project on time, and extended their regards to the construction staff and management cadres who were still sticking to their posts during the holiday to advance the construction progress. Mr. Li Lvhua requested the project manager to make proper meal arrangements with higher food standards for staff during the holiday and strengthen the safety management of the construction site with no relaxation in the supervision of civilized construction. As the rainy season is coming, he also urged the project manager to continue to pay attention to the weather forecast and manage the construction schedule well to mitigate the effect of external conditions on the project progress, ensuring both safety control and construction efficiency.

Project Director Mr. Ruan Changhuai reported to Mr. Li Lvhua and Mr. Li Yuxuan that safety has been regarded as the top priority in project construction. To ensure both construction safety and project progress, the project team has followed the code of “no relaxation during holidays for safety has no holidays”, adopting multiple measures for work safety.

When arriving at the Guangdong Ubridge High-tech Factory, Mr. Li Lvhua and Mr. Li Yuxuan, accompanied by Executive Deputy Director Mr. Li Jian, visited key areas such as the raw material workshops, production workshops, and finished product workshops. They carried out all-around inspections on the implementation of safety measures, checking out the operating status of the equipment, the equipping of fire-fighting facilities, and the management measures of hazardous chemical products.

Mr. Li Lvhua also sent greetings to the frontline staff who stuck to their posts during the holiday. He emphasized, “Safety is the lifeline of enterprise development. We must learn the lessons from all kinds of accidents, building a closed-loop management system of hidden danger investigation, risk management and control, and emergency response drills to ensure zero dead corners and loopholes in work safety.”

At the production base of Guangxi Ubridge, Vice President Mr. Li Dong and Regional General Manager Mr. Fang Gan extended their regards on behalf of the Chairman to the staff who were sticking to their posts during the holiday. Accompanied by the leaders on duty, they carried out a “full-coverage, zero-dead-corner” safety inspection of Fangchenggang No.1 and No.2 Plants respectively to meticulously check the implementation of the safety work.

Vice President Mr. Li Dong emphasized, “Production safety needs to be ‘maintained on a daily basis and strictly enforced on a regular basis’. We should fulfill our safety responsibilities with a prudent attitude of ‘treading on thin ice’, and promote the efficient operation of production and management based on the efficient operation of the integrated work safety mechanism.”

All our staff stuck to their posts during the “Labor Day” holiday. They fulfilled their responsibilities to keep up with the construction schedule of the project, to pursue fine craftsmanship and meticulous production operation, and to maintain a “zero accident” work safety. Ubridge people have demonstrated their commitment with practical actions.

“No relaxation on safety, even more so during holidays”. With this philosophy, the management team guards the lives and health of our staff with an attitude of “constant attention” to ensure the high-quality development of the enterprise.